Contract Signed With Japan Train Technical Service For Construction Of Rail Tracks

INSUBCONTINENT EXCLUSIVE:
Mumbai Ahmedabad Bullet Train Project: System similar to Japan's Shinkansen will be adoptedIndian Railways' firm delegated for the
and design of rail track for the Mumbai-Ahmedabad high-speed rail corridor
Service (JARTS) for advisory, training, and certification services for the railway track work
The rail track packages for the country's first bullet train corridor - Mumbai Ahmedabad high-speed rail, are open for participation by
A system that is similar to Japan's high-speed rail network will be adopted for the Mumbai-Ahmedabad high-speed rail corridor.According to
Most of the train will be done in the country, for which a separate temporary training facility will be set up at Surat, Gujarat
According to NHSRCL, closed arc or EA welding is not done in India, for which training in Japan for a period of 60 days is drawn
Also, onsite training in Japan may also be organised for some engineers depending upon the COVID-19 situation.Incorporated in 1965, the
508 km long Mumbai-Ahmedabad bullet train project is funded by the Japan International Cooperation Agency or JICA.