INSUBCONTINENT EXCLUSIVE:
The rolling power interruptions are expected to be extended to 10 hours from next week, Ada Derana learns.Authorities stated that the water
levels at reservoirs are rapidly decreasing due to the lack of rainfall in the catchment areas supplying water to hydropower plants.In the
meantime, the Kerawalapitiya power plant has temporarily halted its operations due to not receiving fuel stocks required for power
This article first appeared/also appeared in https://adaderana.lk