[Nepal] - NA fixing rain-damaged roads

INSUBCONTINENT EXCLUSIVE:
BAJURA, AUGUST 21A Nepali Army team is actively repairing rainwater damaged roads in
different places of Bajura.
Two-way traffic resumes along Narayangadh-Muglin road section
Narayangadh-Muglin road section obstructed
Major Dhamendra Bahadur Singh of Durgabhanjan Battalion said that the Nepail Army team was active in opening
obstructed roads
The NA team repaired the Martadi-Tribeni road section of Badimalika Municipality
The NA team planned to repair the road section after landslides destroyed the road in many places along the Martadi-Kolti road section
The NA team was deployed after landslides obstructed the road due to incessant rainfall in Badimalika Municipality.Forty NA team members led
by Major Singh are working hard after people faced problems
The road has been repaired with the labour donated by people of Badimalika Municipality. The landslides have put many
infrastructure at risk
Laxmi Secondary School is also at high risk of landslide
The school has been closed for some days due to continuous landslides near the school
Locals said that landslides in the middle of the village had also created fear among the residents.Nepali Army, Armed Police Force, people's
representatives and locals, among others, have actively worked to repair the roads thinking of it as social work
Under the labour donation, four wooden bridges, 240 metres gabbion net, two drinking water projects have been repaired.The NA team is on
standby for disaster management and loss minimisation during the rainy season.A version of this article appears in the print on August 22,
2023, of The Himalayan Times.
This article first appeared/also appeared in https://thehimalayantimes.com